(717) 637-5674

Lapp Farm

Lapp Farm

This Pennsylvania project involved construction of a manure storage tank and an addition to a large barn.

HLS provided the following services for this client:

  • Site survey of existing conditions
  • Existing Conditions Plan
  • Grading and Erosion and Sediment Control plan showing new facility
  • Post Construction Stormwater Management Plan (PCSM)
  • SWM perc testing to assure adequate infiltration rate to support designed SWM
  • Township and Soil Conservation District approval